Scheduling a Multi-Day or Multi-Route Job
Method 1 –
- Open up the Order.
- Click Schedule at the top of the page.
- Click and drag the job from Unscheduled to the first day of the job.
- Repeat steps 1-3 for the remaining days of the job.
Method 2 –
- Go to Scheduling > Schedule.
- Click on the timeslot for the first part of the job. This will open Quick-Add.
- Click the small, gray X in the Order section.
- Select Order Lookup. Click on an order or search for one.
- Click Done.
- Either repeat steps 1-4 or follow Method 1 above.